There have been 5 LN coded new F-35A seen at Nellis recently, so it looks like these are now based there. Could be that some of the Nellis TR2 F-35A end up at Lakenheath as a swap.
F-35 Lightning II developments
Forum rules
Re: F-35 Lightning II developments
Re: F-35 Lightning II developments
-
- Scramble Addict
- Posts: 1594
- Joined: 19 Jun 2012, 10:30
- Type of spotter: I am not Dutch fluent.
- Subscriber Scramble: hammarö
Re: F-35 Lightning II developments
It is one United States F-35 Lightning II unit operating in the ongoing Middle East crisis:
It is CVN-72 Lincoln with 12 F-35C from VMFA-314.
Have I the right connexion?
It is CVN-72 Lincoln with 12 F-35C from VMFA-314.
Have I the right connexion?
Re: F-35 Lightning II developments
22-5691/22-5705 and now 22-5711 all identified. All still coded "LN".raameagle wrote: ↑09 Oct 2024, 08:55 and yet nobody has provided a list of tail numbers for the LN coded jets at Nellis yet!
Re: F-35 Lightning II developments
Re: F-35 Lightning II developments
First flight F-35B 170566 nmks, Oct 9, 2024. This is assumed to be BF-167 but I have no confirmation as of yet.
Tally.
Tally.
Re: F-35 Lightning II developments
Delivery flight
F-35B BF-164 170533 nmks to MCAS Beaufort, Oct 11, 2024.
F-35C CF-101 170544 nmks to NAS Lemoore, Oct 11, 2024.
Tally.
F-35B BF-164 170533 nmks to MCAS Beaufort, Oct 11, 2024.
F-35C CF-101 170544 nmks to NAS Lemoore, Oct 11, 2024.
Tally.
Last edited by tally on 11 Oct 2024, 18:08, edited 1 time in total.
- Starfighter_F-104G
- Scramble Addict
- Posts: 1263
- Joined: 05 May 2012, 17:13
- Type of spotter: serial
- Subscriber Scramble: no
Re: F-35 Lightning II developments
confirmed asStarfighter_F-104G wrote: ↑04 Oct 2024, 14:12 Oct 01, 2024 STRIKE91/92 2x F-35A probably delivered to 115th FW
22-5699 WI
22-5702 WI
- Starfighter_F-104G
- Scramble Addict
- Posts: 1263
- Joined: 05 May 2012, 17:13
- Type of spotter: serial
- Subscriber Scramble: no
- Starfighter_F-104G
- Scramble Addict
- Posts: 1263
- Joined: 05 May 2012, 17:13
- Type of spotter: serial
- Subscriber Scramble: no
Re: F-35 Lightning II developments
F-35A 22-5786 TX 457FS seen 15-10-2024
Last edited by Starfighter_F-104G on 16 Oct 2024, 00:50, edited 1 time in total.
Re: F-35 Lightning II developments
AF-449. But FF was not today. Flew late Friday Oct 11th per my contacts.
Re: F-35 Lightning II developments
Is 22-5786 a new serial? I thought that AF-449 is 22-5965?
Thanks
Ruud
Thanks
Ruud
- Starfighter_F-104G
- Scramble Addict
- Posts: 1263
- Joined: 05 May 2012, 17:13
- Type of spotter: serial
- Subscriber Scramble: no
Re: F-35 Lightning II developments
22-5786 is a correct serial allocation
read pages 174 & 175
@Tally TKS for the update on the f/f
read pages 174 & 175
@Tally TKS for the update on the f/f
Re: F-35 Lightning II developments
So in fact you had the 'original' Lot 15 jets amounting to 48 (AF-382/AF-429 - 22-5682/22-5729) and then they started construction on the Lot 16 jets amounting to 11 so far (AF-430/AF-440 - 22-5946/22-5956) and then converted back to the extra Lot 15 jets (modification contract) which started with AF-441 (22-5778), right. I thought Lot 16 was also for 48 jets originally, so this would mean the remaining 37 jets would be serialled after the other countries' Lot 16 jets.
Wow......
Greets,
Wow......
Greets,
Bjorn Claes
F-16.net editor/photo library admin/serials database admin
F-16.net editor/photo library admin/serials database admin
- Starfighter_F-104G
- Scramble Addict
- Posts: 1263
- Joined: 05 May 2012, 17:13
- Type of spotter: serial
- Subscriber Scramble: no
Re: F-35 Lightning II developments
1st USAF assigned serials for LO 15 & Lot 16 in sequenceBjorn wrote: ↑16 Oct 2024, 18:38 So in fact you had the 'original' Lot 15 jets amounting to 48 (AF-382/AF-429 - 22-5682/22-5729) and then they started construction on the Lot 16 jets amounting to 11 so far (AF-430/AF-440 - 22-5946/22-5956) and then converted back to the extra Lot 15 jets (modification contract) which started with AF-441 (22-5778), right. I thought Lot 16 was also for 48 jets originally, so this would mean the remaining 37 jets would be serialled after the other countries' Lot 16 jets.
Wow......
Greets,
2nd When was signed the Lot 15 modification contract they assigned the extra serials
At the time Lot 16 aircraft were not yet under construction
AF serials are in this order
Lot 15
Lot 16
Lot 15 modification contract - AF serials after the Lot 16 jets but put in assembly BEFORE
separate discussion is the firing order
L/N - C/N - Type (F-35A / B / C) - AF serial or BUNO - client - desigantion (client code) - client registration