F-35 Lightning II developments
Forum rules
- PilotoRico
- Scramble Senior
- Posts: 288
- Joined: 19 Mar 2011, 08:19
- Type of spotter: 100% pure military
- Subscriber Scramble: yes
Re: F-35 Lightning II JSF developments
Does any one know if there is any F-35 in production line for Australia and Norway?
Thanks.
Thanks.
"Rejoice O young man in thy youth..."
- Coati
- Scramble Addict
- Posts: 1561
- Joined: 25 Jun 2005, 19:53
- Type of spotter: S5
- Subscriber Scramble: No
- Location: Meppel, Netherlands
Re: F-35 Lightning II JSF developments
PilotoRico wrote:Does any one know if there is any F-35 in production line for Australia and Norway?
Thanks.
Yes, First two Australian F-35s are in LRIP-6, being c/n AU-1 and AU-2. Assembly of AU-1 started in August 2012. So they are in some stage on the production line, since all LRIP-6 are on the prodction line right now (LRIP-5 is currently running of the production line). Delivery in 2014.
Earlier this year Australia recommitted to the JSF program with the intention to purchase around 100. But next batch will be produced in LRIP-10, so delivery in 2018.
About Norway: the first two aircraft are in LRIP-7, so assembly should start around now. In July already 4 LRIP-7 (out of 37) were on the production line. around 3 or so per month are added so that should be 10 or so by now. Delivery in 2015. After that 2 more in LRIP-8 and then 6 for each successive production year till they have 52.
create your own database with www.spottingmode.com
- PilotoRico
- Scramble Senior
- Posts: 288
- Joined: 19 Mar 2011, 08:19
- Type of spotter: 100% pure military
- Subscriber Scramble: yes
Re: F-35 Lightning II JSF developments
Thanks Coati.... wow, you are very well informed. Thanks for that. I noticed the figure 52 with Norway, so that's the number of F-35's that are ordered? Much better then the 37 we getCoati wrote: Yes, First two Australian F-35s are in LRIP-6, being c/n AU-1 and AU-2. Assembly of AU-1 started in August 2012. So they are in some stage on the production line, since all LRIP-6 are on the prodction line right now (LRIP-5 is currently running of the production line). Delivery in 2014.
Earlier this year Australia recommitted to the JSF program with the intention to purchase around 100. But next batch will be produced in LRIP-10, so delivery in 2018.
About Norway: the first two aircraft are in LRIP-7, so assembly should start around now. In July already 4 LRIP-7 (out of 37) were on the production line. around 3 or so per month are added so that should be 10 or so by now. Delivery in 2015. After that 2 more in LRIP-8 and then 6 for each successive production year till they have 52.
PilotoRico
"Rejoice O young man in thy youth..."
Re: F-35 Lightning II JSF developments
In case anyone wonders where the Dutch 35's reside at the moment I received the following from LMTAS:
AN-1 is currently at Patuxent Naval Air Station, Md., for some tests, and the second jet known as AN-2 was transferred by the U.S. government to the NL Ministry of Defence on September 13, 2013 and was delivered to Eglin Air Force Base, Florida.
Cheers,
tally.
AN-1 is currently at Patuxent Naval Air Station, Md., for some tests, and the second jet known as AN-2 was transferred by the U.S. government to the NL Ministry of Defence on September 13, 2013 and was delivered to Eglin Air Force Base, Florida.
Cheers,
tally.
Re: F-35 Lightning II JSF developments
Great info chaps but when you refer to on the production line, do you mean that parts are being made as opposed to the aircraft are on the final assembly line?
Regards
Mark
Regards
Mark
- Coati
- Scramble Addict
- Posts: 1561
- Joined: 25 Jun 2005, 19:53
- Type of spotter: S5
- Subscriber Scramble: No
- Location: Meppel, Netherlands
Re: F-35 Lightning II JSF developments
With production line I mean final assembly line.
And indeed, pilotorico: Norway has ordered more aircraft compared to what the Netherlands initially will order
[ Post made via Mobile Device ]
And indeed, pilotorico: Norway has ordered more aircraft compared to what the Netherlands initially will order
[ Post made via Mobile Device ]
create your own database with www.spottingmode.com
Re: F-35 Lightning II JSF developments
There are also rumours about Belgium. Apparently they are planning a total between 35 and 60.
Re: F-35 Lightning II JSF developments
Thanks Coati. The Aussie jets you mention may be in production but they are not on the final assembly line just yet.
Regards
Mark
Regards
Mark
Re: F-35 Lightning II JSF developments
i.e. they are not complete airframes, just at the parts stage.
Re: F-35 Lightning II JSF developments
Today 168732 in primer color took to the skies over north texas, to my knowledge, for the first time. Callsign was lightning 11 with F-16C 84-1234 as lightning 12 being chase.
Tally.
[ Post made via Mobile Device ]
Tally.
[ Post made via Mobile Device ]
- Coati
- Scramble Addict
- Posts: 1561
- Joined: 25 Jun 2005, 19:53
- Type of spotter: S5
- Subscriber Scramble: No
- Location: Meppel, Netherlands
Re: F-35 Lightning II JSF developments
Which is BF-34, the last LRIP-4 F-35B.tally wrote:Today 168732 in primer color took to the skies over north texas, to my knowledge, for the first time. Callsign was lightning 11 with F-16C 84-1234 as lightning 12 being chase.
Tally.
[ Post made via Mobile Device ]
create your own database with www.spottingmode.com
- Coati
- Scramble Addict
- Posts: 1561
- Joined: 25 Jun 2005, 19:53
- Type of spotter: S5
- Subscriber Scramble: No
- Location: Meppel, Netherlands
Re: F-35 Lightning II JSF developments
F-35C CF-8 168735/ED-104 was delivered September 13th to Edwards to join the F-35 Integrated Test flight there (currently inventory: 6x F-35A, 2x F-35B and now one F-35C).
create your own database with www.spottingmode.com
- Starfighter_F-104G
- Scramble Addict
- Posts: 1259
- Joined: 05 May 2012, 17:13
- Type of spotter: serial
- Subscriber Scramble: no
Re: F-35 Lightning II JSF developments
Hi!..I'm looking for :
F-35A
09-5004 AF17 delivery date to Edwards
09-5007 AF20 delivery date to Edwards
10-5016 AF28 delivery date to Eglin
F-35B
BF022 , BF24 , BF25 , BF27
any info will be greats
MTIA
F-35A
09-5004 AF17 delivery date to Edwards
09-5007 AF20 delivery date to Edwards
10-5016 AF28 delivery date to Eglin
F-35B
BF022 , BF24 , BF25 , BF27
any info will be greats
MTIA
- Melchior Timmers
- Scramble Addict
- Posts: 1589
- Joined: 13 May 2006, 18:06
- Subscriber Scramble: Melchior Timmers
- Location: Soest
- Contact:
Re: F-35 Lightning II JSF developments
I only have 1 F-35B with the unit (168314)(currently inventory: 6x F-35A, 2x F-35B and now one F-35C).
BF-22 f/f 02dec 12, del by mar13Hi!..I'm looking for :
F-35B
BF022 , BF24 , BF25 , BF27
BF-24 still with LMTAS, Fort Worth, TX by jul13
BF-25 f/f 06mar13, del 27jun13
BF-27 f/f 18mar13, del 19jun13
Melchior Timmers
Editor Scramble Magazine
-----------------------------------------
PO Box 75545
1118 ZN Schiphol
The Netherlands
E-mail: melchior.timmers@scramble.nl
Internet: http://www.scramble.nl" onclick="window.open(this.href);return false;
Editor Scramble Magazine
-----------------------------------------
PO Box 75545
1118 ZN Schiphol
The Netherlands
E-mail: melchior.timmers@scramble.nl
Internet: http://www.scramble.nl" onclick="window.open(this.href);return false;
- Coati
- Scramble Addict
- Posts: 1561
- Joined: 25 Jun 2005, 19:53
- Type of spotter: S5
- Subscriber Scramble: No
- Location: Meppel, Netherlands
Re: F-35 Lightning II JSF developments
fast fact and status from LM sept 2013:Melchior Timmers wrote:I only have 1 F-35B with the unit (168314)(currently inventory: 6x F-35A, 2x F-35B and now one F-35C).
---------------
F-35 Fleet Status
78 F-35s have been delivered to the Department of Defense:
58 Low Rate Initial Production (LRIP) Aircraft
o There are 32 LRIP F-35s based at Eglin AFB, Fla. (14 F-35A (two international aircraft), 13 F-35B
(including three international aircraft) and 2 F-35C)
o There are 2 LRIP F-35As and 2 LRIP F-35Bs based at Edwards AFB, Calif. on loan for SDD.
o There are 4 LRIP F-35As based at Edwards AFB, Calif., for Operational Testing.
o There are 12 LRIP F-35Bs based at MCAS Yuma, Ariz.
o There are 4 LRIP F-35As based at Nellis AFB, Nev.
o There are 3 LRIP F-35s based in Fort Worth expected to ferry to MCAS Yuma, Ariz., and NAS
Patuxent River, Md.
------------
those F-35s are BF-17 and BF-18 (168313 and 168314), both initially stationed on Pax, but later ferried to Edwards.
link for bf-17:
5 March 2013: BF-17 To Edwards
Lockheed Martin test pilot Bill Gigliotti delivered F-35B BF-17 to the F-35 Integrated Test Force at Edwards AFB, California, on 5 March 2013. The aircraft is to be used at the ITF for mission systems testing.
http://www.codeonemagazine.com/f35_arti ... tem_id=116
link for BF-18:
BF-18 Arrives At Edwards
RAF Sdn. Ldr. Jim Schofield delivered F-35B BF-18 to the F-35 Integrated Test Force at Edwards AFB, California, on 26 April 2013. The aircraft will be used at the ITF for Mission System testing. The aircraft was ferried from NAS Patuxent River, Maryland, via Fort Worth, Texas.
http://www.codeonemagazine.com/f35_news ... em_id=1051
and here you have both:
Four- And Five-Ship MADL Connection
14 June 2013: AF-6, AF-7, BF-17, and BF-18 were used to complete the first F-35 airborne four-ship MADL connection at Edwards AFB, California. The airborne four-ship also achieved MADL connectivity with AF-3 during its ground test, marking the first five-ship MADL connection.
http://www.codeonemagazine.com/gallery_ ... ry_style=3
create your own database with www.spottingmode.com