F-35 Lightning II developments
Forum rules
Re: F-35 Lightning II JSF developments
The 26th and final F-35A for the 33FW, 11-5034/EG (AF-45, f/f 21.2.14), was delivered on 28 May. I think originally Eglin had a PAA of 24 'A's, so correct me if I'm wrong about 26.
SD
SD
Last edited by sdamico on 21 Aug 2014, 05:13, edited 1 time in total.
- Piet Luijken
- Moderator
- Posts: 3960
- Joined: 27 Dec 2003, 14:19
- Subscriber Scramble: Piet Luijken
- Location: Amstelveen
Re: F-35 Lightning II JSF developments
these 2 are maybe attrition reserves?
Greetings,
Piet Luijken
Scramble Editor
Piet Luijken
Scramble Editor
Re: F-35 Lightning II JSF developments
This past Wednesday (20 August) another F-35A (serial u/k) departed to Luke as 'Strike 11'.
Additionally, an F-35 (serial u/k) departed to Eglin as 'Strike 41' on Thursday 21st.
SD
Additionally, an F-35 (serial u/k) departed to Eglin as 'Strike 41' on Thursday 21st.
SD
- Starfighter_F-104G
- Scramble Addict
- Posts: 1259
- Joined: 05 May 2012, 17:13
- Type of spotter: serial
- Subscriber Scramble: no
Re: F-35 Lightning II JSF developments
delivery
11-5039 LF 18.08.2014 nr 6 for 61FS not 100% confirmed
11-5040 LF 22.08.2014 nr 7 for 61FS
11-5039 LF 18.08.2014 nr 6 for 61FS not 100% confirmed
11-5040 LF 22.08.2014 nr 7 for 61FS
Re: F-35 Lightning II JSF developments
11-5039 has been ferried to Luke.
Regards
Regards
- Piet Luijken
- Moderator
- Posts: 3960
- Joined: 27 Dec 2003, 14:19
- Subscriber Scramble: Piet Luijken
- Location: Amstelveen
Re: F-35 Lightning II JSF developments
F-35 FLIGHT TEST PROGRAM MILESTONES MATURING COMBAT CAPABILITIES
FORT WORTH, Texas, August 25, 2014 –The Lockheed Martin [NYSE: LMT] F-35 Joint Strike Fighter (JSF) program continued a steady path of flight test milestones in August, including weapons separation, software compatibility and flight hours, all demonstrating program maturity.
“The test milestones are a direct result of the detailed planning, coordination and execution between various government teams and the integrated test force,” said J.D. McFarlan, Lockheed Martin's Vice President for F-35 Test & Verification. “Every testing milestone demonstrates the development of the F-35 in successive steps toward enabling the U.S. Marine Corps to attain its F-35B Initial Operational Capacity (IOC) next year.”
F-35A aircraft AF-1 accomplished its 400th flight during a successful GBU-31 Joint Direct Attack Munition (JDAM) aircraft separation test on Aug. 13 at Edwards Air Force Base, California. This was the first GBU-31 Mark-84 (2,000-pound guided munition) separation demonstration from the F-35. Previous GBU-31 separations were with the BLU-109 (Bomb Live Unit) bomb body.
F-35B aircraft BF-1 and BF-4 completed “Mode 4” formation testing on Aug 9th, as required for Block 2B software capability. “In Mode 4 operations, the STOVL Propulsion System is engaged, the lift fan, roll post nozzle, and three-bearing-swivel nozzle are operating, and all propulsion system doors and inlets are open. Flight testing validated the F-35B Short Take Off and Vertical Landing (STOVL) variant’s ability to operate well in this configuration during formation flight which supports operations around the ship; a key milestone for the F-35B path to IOC,” McFarlan said.
F-35B aircraft BF-3 completed the 2B software fleet release weapon separation requirements for the F-35B with two successful AIM-120 Advanced Medium Range Air-to-Air Missile (AMRAAM) Air Vehicle Instrumented (AAVI) separation flights on consecutive days, Aug. 14 and 15. The AIM-120 radar-guided missiles were launched over the Atlantic Test Range. “2B software fleet release is critical to the warfighter because it delivers the first combat capability to our most dominant 5th generation platform. Weapons employment is one the most critical combat capabilities. This culminates years of dedicated work that proves safe separation in 2B configurations and provides this capability and confidence to our customers,” McFarlan said.
Along with the testing milestones, to date, the overall System Development and Demonstration (SDD) F-35A test fleet surpassed its 4,000th flight hour on Aug. 14 and in total, the F-35 Fleet has surpassed 19,500 flight hours, with more than 8,000 hours in SDD aircraft. F-35A aircraft AF-1 achieved its 400th flight milestone on Aug. 13; F-35A aircraft AF-4 surpassed 500 flight hours, Aug. 11 and F-35C aircraft CF-2 achieved 300 flights on Aug. 14.
FORT WORTH, Texas, August 25, 2014 –The Lockheed Martin [NYSE: LMT] F-35 Joint Strike Fighter (JSF) program continued a steady path of flight test milestones in August, including weapons separation, software compatibility and flight hours, all demonstrating program maturity.
“The test milestones are a direct result of the detailed planning, coordination and execution between various government teams and the integrated test force,” said J.D. McFarlan, Lockheed Martin's Vice President for F-35 Test & Verification. “Every testing milestone demonstrates the development of the F-35 in successive steps toward enabling the U.S. Marine Corps to attain its F-35B Initial Operational Capacity (IOC) next year.”
F-35A aircraft AF-1 accomplished its 400th flight during a successful GBU-31 Joint Direct Attack Munition (JDAM) aircraft separation test on Aug. 13 at Edwards Air Force Base, California. This was the first GBU-31 Mark-84 (2,000-pound guided munition) separation demonstration from the F-35. Previous GBU-31 separations were with the BLU-109 (Bomb Live Unit) bomb body.
F-35B aircraft BF-1 and BF-4 completed “Mode 4” formation testing on Aug 9th, as required for Block 2B software capability. “In Mode 4 operations, the STOVL Propulsion System is engaged, the lift fan, roll post nozzle, and three-bearing-swivel nozzle are operating, and all propulsion system doors and inlets are open. Flight testing validated the F-35B Short Take Off and Vertical Landing (STOVL) variant’s ability to operate well in this configuration during formation flight which supports operations around the ship; a key milestone for the F-35B path to IOC,” McFarlan said.
F-35B aircraft BF-3 completed the 2B software fleet release weapon separation requirements for the F-35B with two successful AIM-120 Advanced Medium Range Air-to-Air Missile (AMRAAM) Air Vehicle Instrumented (AAVI) separation flights on consecutive days, Aug. 14 and 15. The AIM-120 radar-guided missiles were launched over the Atlantic Test Range. “2B software fleet release is critical to the warfighter because it delivers the first combat capability to our most dominant 5th generation platform. Weapons employment is one the most critical combat capabilities. This culminates years of dedicated work that proves safe separation in 2B configurations and provides this capability and confidence to our customers,” McFarlan said.
Along with the testing milestones, to date, the overall System Development and Demonstration (SDD) F-35A test fleet surpassed its 4,000th flight hour on Aug. 14 and in total, the F-35 Fleet has surpassed 19,500 flight hours, with more than 8,000 hours in SDD aircraft. F-35A aircraft AF-1 achieved its 400th flight milestone on Aug. 13; F-35A aircraft AF-4 surpassed 500 flight hours, Aug. 11 and F-35C aircraft CF-2 achieved 300 flights on Aug. 14.
Greetings,
Piet Luijken
Scramble Editor
Piet Luijken
Scramble Editor
-
- Scramble Addict
- Posts: 2080
- Joined: 14 Jun 2007, 20:50
- Subscriber Scramble: wamovements
Re: F-35 Lightning II JSF developments
Does anyone know if the 11-5037 or the 11-5038 is already delivered to the 61st FS?
At least the following six have been delivered:
11-5030,
11-5031,
11-5035,
11-5036,
11-5039,
11-5040.
At least the following six have been delivered:
11-5030,
11-5031,
11-5035,
11-5036,
11-5039,
11-5040.
Re: F-35 Lightning II JSF developments
AFAIK 11-5037 is at LF yes.
Regards
Regards
- Starfighter_F-104G
- Scramble Addict
- Posts: 1259
- Joined: 05 May 2012, 17:13
- Type of spotter: serial
- Subscriber Scramble: no
Re: F-35 Lightning II JSF developments
F-35A nr 9 for 61FS arrived at Luke 04.09.2014
- Stratofreighter
- Scramble Master
- Posts: 22206
- Joined: 25 Jan 2006, 08:02
- Location: Netherlands
Re: F-35 Lightning II JSF developments
http://www.reuters.com/article/2014/09/ ... P620140924South Korea to sign deal this month to buy 40 F-35 jets for $7 billion
South Korea will sign a deal this month to buy 40 Lockheed Martin Corp (LMT.N) F-35 fighter jets for about 7.34 trillion won ($7.06 billion) for delivery in 2018-2021,
two people with knowledge of the transaction told Reuters on Wednesday.
November 2024 update at FokkerNews.nl....
- Piet Luijken
- Moderator
- Posts: 3960
- Joined: 27 Dec 2003, 14:19
- Subscriber Scramble: Piet Luijken
- Location: Amstelveen
Re: F-35 Lightning II JSF developments
REPUBLIC OF KOREA APPROVES PROCUREMENT OF
LOCKHEED MARTIN F-35A LIGHTNING II
FORT WORTH, Texas, Sept. 24, 2014 – The Republic of Korea finalized its formal selection of the Lockheed Martin [NYSE: LMT] F-35A Lightning II aircraft for its F-X fighter acquisition program, announcing its intent to sign the Letter of Offer and Acceptance (LOA) between the U.S. and Korean governments for 40 F-35A Conventional Take Off and Landing (CTOL) variant jets with initial deliveries beginning in 2018.
“We are honored by and appreciate the trust and confidence the Republic of Korea has placed in the 5th Generation F-35 to meet its demanding security requirements on the Korean Peninsula. We look forward to producing and delivering, on time and within budget, Korea’s F-35A Conventional Take Off and Landing variant aircraft,” said Orlando Carvalho, Lockheed Martin Aeronautics executive vice president. “This decision strengthens and extends our long-standing security partnership and truly enhances the regional stability among our greater Asia Pacific allies.”
Following a comprehensive evaluation process for its F-X program, the Republic of Korea, which first announced its competitive selection of the F-35 over the 4th Generation Boeing F-15 Silent Eagle and the EADS Eurofighter Typhoon in March this year, now becomes the third Foreign Military Sales country to procure the F-35, joining Israel and Japan who selected the F-35A in 2010 and 2011, respectively.
LOCKHEED MARTIN F-35A LIGHTNING II
FORT WORTH, Texas, Sept. 24, 2014 – The Republic of Korea finalized its formal selection of the Lockheed Martin [NYSE: LMT] F-35A Lightning II aircraft for its F-X fighter acquisition program, announcing its intent to sign the Letter of Offer and Acceptance (LOA) between the U.S. and Korean governments for 40 F-35A Conventional Take Off and Landing (CTOL) variant jets with initial deliveries beginning in 2018.
“We are honored by and appreciate the trust and confidence the Republic of Korea has placed in the 5th Generation F-35 to meet its demanding security requirements on the Korean Peninsula. We look forward to producing and delivering, on time and within budget, Korea’s F-35A Conventional Take Off and Landing variant aircraft,” said Orlando Carvalho, Lockheed Martin Aeronautics executive vice president. “This decision strengthens and extends our long-standing security partnership and truly enhances the regional stability among our greater Asia Pacific allies.”
Following a comprehensive evaluation process for its F-X program, the Republic of Korea, which first announced its competitive selection of the F-35 over the 4th Generation Boeing F-15 Silent Eagle and the EADS Eurofighter Typhoon in March this year, now becomes the third Foreign Military Sales country to procure the F-35, joining Israel and Japan who selected the F-35A in 2010 and 2011, respectively.
Greetings,
Piet Luijken
Scramble Editor
Piet Luijken
Scramble Editor
- Coati
- Scramble Addict
- Posts: 1561
- Joined: 25 Jun 2005, 19:53
- Type of spotter: S5
- Subscriber Scramble: No
- Location: Meppel, Netherlands
Re: F-35 Lightning II JSF developments
F-35 jet combat ready next year, new Israeli order close
(Reuters) - The first version of the F-35 fighter jet will be combat ready by mid-2015, despite an engine failure which still needs a fix, and Israel could sign a deal within months to buy more of the aircraft, program officials said on Thursday.
The cost of the jet, which has struggled with delays and budget overruns, could be reduced to the target level by 2019. South Korea's decision on Wednesday to buy 40 F-35s for about $7 billion was a step in lowering the per unit cost, officials said in Oslo after a two-day meeting between F-35 partner countries.
"We are in discussion with another one of our partners, Israel, to increase their buy and those discussions are going very very well," U.S. Air Force Lieutenant General Chris Bogdan, the Pentagon's F-35 program manager said.
"We are very very close, (we'll sign) probably within the next few months," Bogdan said.
Israel has so far ordered 19 jets but Bogdan declined to predict the size of its future order.
More at the link
http://www.reuters.com/article/2014/09/ ... BN20140925
(Reuters) - The first version of the F-35 fighter jet will be combat ready by mid-2015, despite an engine failure which still needs a fix, and Israel could sign a deal within months to buy more of the aircraft, program officials said on Thursday.
The cost of the jet, which has struggled with delays and budget overruns, could be reduced to the target level by 2019. South Korea's decision on Wednesday to buy 40 F-35s for about $7 billion was a step in lowering the per unit cost, officials said in Oslo after a two-day meeting between F-35 partner countries.
"We are in discussion with another one of our partners, Israel, to increase their buy and those discussions are going very very well," U.S. Air Force Lieutenant General Chris Bogdan, the Pentagon's F-35 program manager said.
"We are very very close, (we'll sign) probably within the next few months," Bogdan said.
Israel has so far ordered 19 jets but Bogdan declined to predict the size of its future order.
More at the link
http://www.reuters.com/article/2014/09/ ... BN20140925
create your own database with www.spottingmode.com
- Piet Luijken
- Moderator
- Posts: 3960
- Joined: 27 Dec 2003, 14:19
- Subscriber Scramble: Piet Luijken
- Location: Amstelveen
Re: F-35 Lightning II JSF developments
The Air Force says a squadron of its new combat jet, the F-35, will arrive in Hill AFB in September 2015.
Greetings,
Piet Luijken
Scramble Editor
Piet Luijken
Scramble Editor
- Starfighter_F-104G
- Scramble Addict
- Posts: 1259
- Joined: 05 May 2012, 17:13
- Type of spotter: serial
- Subscriber Scramble: no
Re: F-35 Lightning II JSF developments
F-35A AU-01 A35-001 first flight 29-09-2014
- Krazy
- Scramble Die-Hard
- Posts: 565
- Joined: 20 Mar 2007, 15:13
- Type of spotter: F3
- Location: Between EHTW, ETNP, EDLS...
Re: F-35 Lightning II JSF developments
Video on: http://www.businessinsider.com.au/video ... ht-2014-10Starfighter_F-104G wrote:F-35A AU-01 A35-001 first flight 29-09-2014