F-35 Lightning II developments

ImageForum for news and discussions on miltary aviation matters.

Forum rules
Image
Post Reply
sdamico
Scramble Junior
Scramble Junior
Posts: 201
Joined: 21 Sep 2009, 19:25

Re: F-35 Lightning II JSF developments

Post by sdamico »

The 26th and final F-35A for the 33FW, 11-5034/EG (AF-45, f/f 21.2.14), was delivered on 28 May. I think originally Eglin had a PAA of 24 'A's, so correct me if I'm wrong about 26.

SD
Last edited by sdamico on 21 Aug 2014, 05:13, edited 1 time in total.
User avatar
Piet Luijken
Moderator
Moderator
Posts: 3960
Joined: 27 Dec 2003, 14:19
Subscriber Scramble: Piet Luijken
Location: Amstelveen

Re: F-35 Lightning II JSF developments

Post by Piet Luijken »

these 2 are maybe attrition reserves?
Greetings,

Piet Luijken
Scramble Editor
sdamico
Scramble Junior
Scramble Junior
Posts: 201
Joined: 21 Sep 2009, 19:25

Re: F-35 Lightning II JSF developments

Post by sdamico »

This past Wednesday (20 August) another F-35A (serial u/k) departed to Luke as 'Strike 11'.

Additionally, an F-35 (serial u/k) departed to Eglin as 'Strike 41' on Thursday 21st.

SD
User avatar
Starfighter_F-104G
Scramble Addict
Scramble Addict
Posts: 1259
Joined: 05 May 2012, 17:13
Type of spotter: serial
Subscriber Scramble: no

Re: F-35 Lightning II JSF developments

Post by Starfighter_F-104G »

delivery
11-5039 LF 18.08.2014 nr 6 for 61FS not 100% confirmed
11-5040 LF 22.08.2014 nr 7 for 61FS
raameagle
Scramble Addict
Scramble Addict
Posts: 1076
Joined: 09 Aug 2006, 15:23

Re: F-35 Lightning II JSF developments

Post by raameagle »

11-5039 has been ferried to Luke.

Regards
User avatar
Piet Luijken
Moderator
Moderator
Posts: 3960
Joined: 27 Dec 2003, 14:19
Subscriber Scramble: Piet Luijken
Location: Amstelveen

Re: F-35 Lightning II JSF developments

Post by Piet Luijken »

F-35 FLIGHT TEST PROGRAM MILESTONES MATURING COMBAT CAPABILITIES

FORT WORTH, Texas, August 25, 2014 –The Lockheed Martin [NYSE: LMT] F-35 Joint Strike Fighter (JSF) program continued a steady path of flight test milestones in August, including weapons separation, software compatibility and flight hours, all demonstrating program maturity.

“The test milestones are a direct result of the detailed planning, coordination and execution between various government teams and the integrated test force,” said J.D. McFarlan, Lockheed Martin's Vice President for F-35 Test & Verification. “Every testing milestone demonstrates the development of the F-35 in successive steps toward enabling the U.S. Marine Corps to attain its F-35B Initial Operational Capacity (IOC) next year.”

F-35A aircraft AF-1 accomplished its 400th flight during a successful GBU-31 Joint Direct Attack Munition (JDAM) aircraft separation test on Aug. 13 at Edwards Air Force Base, California. This was the first GBU-31 Mark-84 (2,000-pound guided munition) separation demonstration from the F-35. Previous GBU-31 separations were with the BLU-109 (Bomb Live Unit) bomb body.

F-35B aircraft BF-1 and BF-4 completed “Mode 4” formation testing on Aug 9th, as required for Block 2B software capability. “In Mode 4 operations, the STOVL Propulsion System is engaged, the lift fan, roll post nozzle, and three-bearing-swivel nozzle are operating, and all propulsion system doors and inlets are open. Flight testing validated the F-35B Short Take Off and Vertical Landing (STOVL) variant’s ability to operate well in this configuration during formation flight which supports operations around the ship; a key milestone for the F-35B path to IOC,” McFarlan said.

F-35B aircraft BF-3 completed the 2B software fleet release weapon separation requirements for the F-35B with two successful AIM-120 Advanced Medium Range Air-to-Air Missile (AMRAAM) Air Vehicle Instrumented (AAVI) separation flights on consecutive days, Aug. 14 and 15. The AIM-120 radar-guided missiles were launched over the Atlantic Test Range. “2B software fleet release is critical to the warfighter because it delivers the first combat capability to our most dominant 5th generation platform. Weapons employment is one the most critical combat capabilities. This culminates years of dedicated work that proves safe separation in 2B configurations and provides this capability and confidence to our customers,” McFarlan said.

Along with the testing milestones, to date, the overall System Development and Demonstration (SDD) F-35A test fleet surpassed its 4,000th flight hour on Aug. 14 and in total, the F-35 Fleet has surpassed 19,500 flight hours, with more than 8,000 hours in SDD aircraft. F-35A aircraft AF-1 achieved its 400th flight milestone on Aug. 13; F-35A aircraft AF-4 surpassed 500 flight hours, Aug. 11 and F-35C aircraft CF-2 achieved 300 flights on Aug. 14.
Greetings,

Piet Luijken
Scramble Editor
wamovements
Scramble Addict
Scramble Addict
Posts: 2080
Joined: 14 Jun 2007, 20:50
Subscriber Scramble: wamovements

Re: F-35 Lightning II JSF developments

Post by wamovements »

Does anyone know if the 11-5037 or the 11-5038 is already delivered to the 61st FS?
At least the following six have been delivered:
11-5030,
11-5031,
11-5035,
11-5036,
11-5039,
11-5040.
raameagle
Scramble Addict
Scramble Addict
Posts: 1076
Joined: 09 Aug 2006, 15:23

Re: F-35 Lightning II JSF developments

Post by raameagle »

AFAIK 11-5037 is at LF yes.

Regards
User avatar
Starfighter_F-104G
Scramble Addict
Scramble Addict
Posts: 1259
Joined: 05 May 2012, 17:13
Type of spotter: serial
Subscriber Scramble: no

Re: F-35 Lightning II JSF developments

Post by Starfighter_F-104G »

F-35A nr 9 for 61FS arrived at Luke 04.09.2014
User avatar
Stratofreighter
Scramble Master
Scramble Master
Posts: 22206
Joined: 25 Jan 2006, 08:02
Location: Netherlands

Re: F-35 Lightning II JSF developments

Post by Stratofreighter »

South Korea to sign deal this month to buy 40 F-35 jets for $7 billion
http://www.reuters.com/article/2014/09/ ... P620140924
South Korea will sign a deal this month to buy 40 Lockheed Martin Corp (LMT.N) F-35 fighter jets for about 7.34 trillion won ($7.06 billion) for delivery in 2018-2021,
two people with knowledge of the transaction told Reuters on Wednesday.
November 2024 update at FokkerNews.nl....
User avatar
Piet Luijken
Moderator
Moderator
Posts: 3960
Joined: 27 Dec 2003, 14:19
Subscriber Scramble: Piet Luijken
Location: Amstelveen

Re: F-35 Lightning II JSF developments

Post by Piet Luijken »

REPUBLIC OF KOREA APPROVES PROCUREMENT OF
LOCKHEED MARTIN F-35A LIGHTNING II

FORT WORTH, Texas, Sept. 24, 2014 – The Republic of Korea finalized its formal selection of the Lockheed Martin [NYSE: LMT] F-35A Lightning II aircraft for its F-X fighter acquisition program, announcing its intent to sign the Letter of Offer and Acceptance (LOA) between the U.S. and Korean governments for 40 F-35A Conventional Take Off and Landing (CTOL) variant jets with initial deliveries beginning in 2018.

“We are honored by and appreciate the trust and confidence the Republic of Korea has placed in the 5th Generation F-35 to meet its demanding security requirements on the Korean Peninsula. We look forward to producing and delivering, on time and within budget, Korea’s F-35A Conventional Take Off and Landing variant aircraft,” said Orlando Carvalho, Lockheed Martin Aeronautics executive vice president. “This decision strengthens and extends our long-standing security partnership and truly enhances the regional stability among our greater Asia Pacific allies.”

Following a comprehensive evaluation process for its F-X program, the Republic of Korea, which first announced its competitive selection of the F-35 over the 4th Generation Boeing F-15 Silent Eagle and the EADS Eurofighter Typhoon in March this year, now becomes the third Foreign Military Sales country to procure the F-35, joining Israel and Japan who selected the F-35A in 2010 and 2011, respectively.
Greetings,

Piet Luijken
Scramble Editor
User avatar
Coati
Scramble Addict
Scramble Addict
Posts: 1561
Joined: 25 Jun 2005, 19:53
Type of spotter: S5
Subscriber Scramble: No
Location: Meppel, Netherlands

Re: F-35 Lightning II JSF developments

Post by Coati »

F-35 jet combat ready next year, new Israeli order close

(Reuters) - The first version of the F-35 fighter jet will be combat ready by mid-2015, despite an engine failure which still needs a fix, and Israel could sign a deal within months to buy more of the aircraft, program officials said on Thursday.

The cost of the jet, which has struggled with delays and budget overruns, could be reduced to the target level by 2019. South Korea's decision on Wednesday to buy 40 F-35s for about $7 billion was a step in lowering the per unit cost, officials said in Oslo after a two-day meeting between F-35 partner countries.

"We are in discussion with another one of our partners, Israel, to increase their buy and those discussions are going very very well," U.S. Air Force Lieutenant General Chris Bogdan, the Pentagon's F-35 program manager said.

"We are very very close, (we'll sign) probably within the next few months," Bogdan said.

Israel has so far ordered 19 jets but Bogdan declined to predict the size of its future order.


More at the link

http://www.reuters.com/article/2014/09/ ... BN20140925
create your own database with www.spottingmode.com
User avatar
Piet Luijken
Moderator
Moderator
Posts: 3960
Joined: 27 Dec 2003, 14:19
Subscriber Scramble: Piet Luijken
Location: Amstelveen

Re: F-35 Lightning II JSF developments

Post by Piet Luijken »

The Air Force says a squadron of its new combat jet, the F-35, will arrive in Hill AFB in September 2015.
Greetings,

Piet Luijken
Scramble Editor
User avatar
Starfighter_F-104G
Scramble Addict
Scramble Addict
Posts: 1259
Joined: 05 May 2012, 17:13
Type of spotter: serial
Subscriber Scramble: no

Re: F-35 Lightning II JSF developments

Post by Starfighter_F-104G »

F-35A AU-01 A35-001 first flight 29-09-2014
User avatar
Krazy
Scramble Die-Hard
Scramble Die-Hard
Posts: 565
Joined: 20 Mar 2007, 15:13
Type of spotter: F3
Location: Between EHTW, ETNP, EDLS...

Re: F-35 Lightning II JSF developments

Post by Krazy »

Starfighter_F-104G wrote:F-35A AU-01 A35-001 first flight 29-09-2014
Video on: http://www.businessinsider.com.au/video ... ht-2014-10
Image
Post Reply

Return to “Military Aviation News”